Bălușeni: water and sewer contract, 1,786 m of pipe stated
Comuna Bălușeni in Botoșani county signed a contract on 27 October 2026 worth 8,558,964.36 RON, about 1,600,165 EUR, to extend its water supply and sewer system, with a works period of 12 months. The notice states one length, 1,786 m of PEHD pipe, Dn 110 mm, Pn10. It names wastewater pumping stations, valve chambers and manholes without a number.
Comuna Bălușeni in Botoșani county signed a contract on 27 October 2026 to extend its water supply and sewer system. The value is 8,558,964.36 RON, about 1,600,165 EUR, and the works period is 12 months. The contractor named in the notice is CORNELL S TEHNIC CONSTRUCT, with CORNELL'S FLOOR S.R.L. listed as a consortium member.
Of everything the notice lists, one item carries a length: 1,786 m of PEHD pipe. This article sets out that figure, the items that come without a number, and how far a supplier can read the notice.
What was signed in Bălușeni
The contract is notice SCNA1138523 on the public procurement portal. Its title is Execuția lucrărilor aferente obiectivului de investiții: Extinderea sistemului de alimentare cu apă și canalizare în comuna Bălușeni, județul Botoșani, so this is works execution. The notice is recorded as lot 1, and its CPV code is 45232150-8.
The authority field of the notice reads COMUNA BALUSENI (PRIMARIA COMUNEI BALUSENI), without diacritics. Anyone searching the portal for the commune should try both spellings, Bălușeni and Baluseni.
It was signed and published on the same day, 27 October 2026. In our data that is a lag of 0 days. Over the last 30 days the median gap between signature and publication was 4 days, and over the last 90 days it was 7 days. A notice that appears on the day of signature is early for this pool.
The notice lists ten items in two systems
The description splits the project into a water supply system and a sewer system. Under water supply it names four items: distribution pipes, valve chambers, individual service connections and hydrants. Under sewer it names six: a gravity network for domestic wastewater, wastewater pumping stations, pressure pipes, manholes, valve chambers on the pressure pipes and individual connections.
Stații de pompare ape uzate;
In English: wastewater pumping stations. The notice lists them as a component of the sewer system and gives no number in the text we hold. The same is true of the valve chambers (cămine de vane), which appear in both lists, and of the manholes (cămine de vizitare).
One length is stated: 1,786 m
The notice contains one sentence with a quantity:
Conductele se vor realiza din tuburi PEHD-RC cu acoperire protectivă din PP, Pn10, Dn 110 mm pe o lungime de 1786,00 m.
In English: the pipes will be made of PEHD-RC tubes with a protective PP coating, Pn10, Dn 110 mm, over a length of 1,786 m. That gives a material (PEHD-RC), a pressure class (Pn10), a diameter (Dn 110 mm) and a length.
The sentence we hold says Conductele, "the pipes", without saying in that sentence whether they belong to the water or the sewer system. We therefore do not call it the distribution network or the pressure pipe. The gravity sewer network is named in the list with no length of its own.
What a supplier can and cannot read from it
The notice gives a place, a works period of 12 months, a value and one pipe specification with its length. A supplier of pipes and pumps can read the pipe type and the 1,786 m. A supplier of drainage and precast concrete can read that manholes and valve chambers are part of the works, but not how many.
The text we hold does not give pump capacities, the number of stations, the diameters of the gravity sewer or the number of service connections. Such detail is normally in the design documentation, which we do not hold. Romania's public procurement law is Law no. 98/2016. The notice also says nothing about who will supply any of this, and we do not guess.
Earlier contracts of the same kind show how much detail a notice can carry. The Bilbor and Scortoasa notices state many lengths and counts, and the Buza and Dostat article is about pumping stations. Bălușeni gives far less. The evidence page shows how a notice enters our pool, with the dates of signature and publication.
The contracts in this article
| Notice | Contracting authority | Contractor | Signed | Value | Stated in the notice |
|---|---|---|---|---|---|
| SCNA1138523 | COMUNA BALUSENI (PRIMARIA COMUNEI BALUSENI) | CORNELL S TEHNIC CONSTRUCT | 27.10.2026 | 8,558,964 RON (€1.6M) | Pipes: 1,786 m |
Data as of 29.10.2026. Source: SICAP (e-licitatie.ro); the link opens the notice.
Frequently asked questions
How much pipe does the Bălușeni contract state?
The notice states 1,786 m of PEHD-RC pipe with a protective PP coating, Pn10, Dn 110 mm. The sentence does not say whether it belongs to the water or the sewer system. No other pipe length is given in the text we hold.
Does the notice state how many pumping stations there are?
No. It lists wastewater pumping stations as part of the sewer system but gives no number and no capacity. The same applies to the manholes and valve chambers.
Who signed the contract, and for how much?
Comuna Bălușeni signed on 27 October 2026 with CORNELL S TEHNIC CONSTRUCT, with CORNELL'S FLOOR S.R.L. listed as a consortium member. The value recorded is 8,558,964.36 RON, about 1,600,165 EUR, with a works period of 12 months.
How fast did the notice appear after signature?
On the same day. The median gap in our pool is 4 days over the last 30 days and 7 days over the last 90 days.